Projects executed by CTE WIND

TEILLAY

TEILLAY

  • Location: France
  • Year: 2017
  • Mission: Foundation & anchor cage design
  • Manufacturer: Gamesa
  • Number of turbines: 4
  • Power output: 8MW

Innovative solution - Increasing the tower's Hub Height! The particularity is the length proposed for the anchor cage bolts (8.20m) which allows the elevation of the tower (the plinth's height = 5.5m).

GULF OF SUEZ - BOO

GULF OF SUEZ - BOO

  • Location: Egypt
  • Year: 2018
  • Mission: Foundation design
  • Manufacturer: Gamesa
  • Number of turbines: 125
  • Power output: 262.5MW

This is the first renewable-energy independent power producer project of a significant size awarded in Egypt.

CAPPAWHITE B

CAPPAWHITE B

  • Location: Ireland
  • Year: 2017
  • Mission: Foundation design
  • Manufacturer: Vestas
  • Number of turbines: 4
  • Power output: 14.4MW

The project marks the first Vestas V105-3.45 MW order in Ireland, which is especially well-suited for the high wind conditions found here.

ALIBUNAR

ALIBUNAR

  • Location: Serbia
  • Year: 2016
  • Mission: Foundation Design
  • Manufacturer: Senvion
  • Number of turbines: 21
  • Power output: 42MW

The 21 turbines will together produce enough energy to power around 27,600 households on average per year.

VENTOS DO ARARIPE

VENTOS DO ARARIPE

  • Location: Brazil
  • Year: 2016
  • Mission: Design Review (category III check)
  • Manufacturer: GE
  • Number of turbines: 156
  • Power output: 360MW

Construction has been completed for all fourteen phases of the Ventos do Araripe complex which is located in Piauí and Pernambuco, Northeast Region of Brazil.

T2 TROPICAL & T3 KRS THREE

T2 TROPICAL & T3 KRS THREE

  • Location: Thailand
  • Year: 2017
  • Mission : Foundation design & site supervision
  • Manufacturer: Vestas
  • Number of turbines: 60
  • Power output: 180MW

With a hub height of 157 metres, the dual wind parks will feature the highest Vestas towers in Asia to date.

OMBEPO

OMBEPO

  • Location: Namibia
  • Year: 2017
  • Mission: Foundation Design
  • Manufacturer: XEMC
  • Number of turbines: 3
  • Power output: 5MW

In Southern Africa, the 5MW Ombepo Wind Farm is expected to be connected to Namibia’s national electricity grid by the end of 2017.

SAINTE-ROSE

SAINTE-ROSE

  • Location: Guadeloupe
  • Year: 2017
  • Mission: Foundation Design
  • Manufacturer: Gamesa
  • Number of turbines: 8
  • Power output: 16MW

This is the 1st Guadeloupe's multimegawatt wind energy project.

ZAPORIZHIA

ZAPORIZHIA

  • Location: Ukraine
  • Year: 2017
  • Mission: Foundation Design
  • Manufacturer: Vestas
  • Number of turbines: 167
  • Power output: 550MW

With 3.3MW capacity turbines, this is the largest European project. The design for the first fase of 16 turbines has been completed.

TARFAYA

TARFAYA

  • Location: Morocco
  • Year: 2013
  • Mission: Foundation Design
  • Manufacturer: Siemens
  • Number of turbines: 131
  • Power output: 301MW

One of the largest wind farm in Africa and its privileged locations allows a high generating efficiency.

MALIBUNAR

MALIBUNAR

  • Location: Serbia
  • Year: 2016
  • Mission: Design Review (category III check)/Foundation Design
  • Manufacturer: Senvion
  • Number of turbines: 4
  • Power output: 8MW

Planned for 2018, this project located about 20 kilometres north of Belgrade marks a succesfull entry into the Serbian market.

KHALLADI

KHALLADI

  • Location: Morocco
  • Year: 2016
  • Mission: Foundation design
  • Manufacturer: Vestas
  • Number of turbines: 40
  • Power output: 120MW

The Khalladi project should contribute to the achievement of the Moroccan government which aims to raise the share of renewable energy to 52% of total production by 2030.

VENTOS DA BAHIA

VENTOS DA BAHIA

  • Location: Brazil
  • Year: 2016
  • Mission: Foundation Design
  • Manufacturer: Acciona
  • Number of turbines: 22
  • Power output: 66MW

The turbines will be installed on concrete towers with a height of 120 meters.

CATALAN

CATALAN

  • Location: France
  • Year: 2014
  • Mission: Foundation Design
  • Manufacturer: Vestas
  • Number of turbines: 33
  • Power output: 96MW

Opened in june 2016, this is the largest wind farm in France to date.

BROCKAGHBOY

BROCKAGHBOY

  • Location: Northern Ireland
  • Year: 2016
  • Mission: Design Review
  • Manufacturer: Nordex
  • Number of turbines: 19
  • Power output: 57MW

The wind farm is located in County Londonderry and is one of the largest investments in the country.