CTE WIND BRASIL

Established in 2013, CTE WIND BRASIL "Subsidiary of CTE WIND" (before CPA since 2000) is a Brazilian consulting firm specialized in the design of onshore wind turbines foundations. The office is composed of Brazilian engineers (members of CREA) knowing the regulations in force.

CTE WIND BRASIL has worked in several regions in Brazil such as : Rio Grande do Sul, Santa Catarina, Ceará, Rio Grande do Norte, et de Bahia. Thus, we designed the foundations for steel and concrete towers.

Detailed achievements

Wind farmLocationStatusManufacturerYear
EURUS JOÃO CÃMARA / RN PRE-DESIGN VESTAS 2009
RENASCENÇA JOÃO CÃMARA / RN PRE-DESIGN GE 2009
SÃO BENTO SÃO BENTO DO NORTE / RN PRE-DESIGN GE / VESTAS / GAMESA 2010
TRAIRI, GUAJIRÚ, MUNDAÚ E FLEIXEIRAS I TRAIRÍ / CE PRE-DESIGN SIEMENS 2010
COMPLEXO EÓLICO BAHIA PRE-DESIGN GE 2010
COMPLEXO EÓLICO ST.TEREZA, ARPOEIRAS, I.D. COQUEIROS, S. ROQUE / CE PRE-DESIGN GE / SIEMENS 2010
MORRINHOS CAMPO FORMOSO / BA PRE-DESIGN GE / SIEMENS / VESTAS 2011
EURUS E RENASCENÇA JOÃO CÃMARA / RN PRE-DESIGN VESTAS 2011
UNIÃO DOS VENTOS PEDRA GRANDE / RN EXPERTISE GE 2011
MANGUEIRA SANTA VITÓRIA DO PALMAR / RS PRE-DESIGN VESTAS 2011
FORÇA DOS VENTOS VIAMÃO / RS DETAILED DESIGN GE 2011
PROJETO BÁSICO DESERTO / CE PRE-DESIGN GE / SIEMENS 2011
ÁGUA DOCE ÁGUA DOCE / SC EXPERTISE IMPSA 2011
MORRO DOS VENTOS JOÃO CÃMARA / RN EXPERTISE GE 2012
SÃO MIGUEL DO GOSTOSO SÃO MIGUEL DO GOSTOSO / RN PRE-DESIGN ACCIONA 2012
MORRO DOS VENTOS 2 JOÃO CÃMARA / RN PRE-DESIGN GE 2012
AREIA BRANCA AREIA BRANCA / RN PRE-DESIGN ACCIONA 2013
CORREDOR DO SENANDES RIO GRANDE / RS EXPERTISE ALSTOM 2013
PARACURU PARACURU / CE DETAILED DESIGN IMPSA 2013
XIQUE XIQUE XIQUE XIQUE / BA PRE-DESIGN GAMESA 2013
CASSINO PARNAIBA / PI PRE-DESIGN ALSTOM 2013
TESTA BRANCA PARNAIBA / PI PRE-DESIGN GAMESA 2013
TOUROS TOUROS / RN PRE-DESIGN GAMESA / GE 2013
ENTORNO CERRO CHATO 2 SANTANA DO LIVRAMENTO / RS DETAILED DESIGN GAMESA 2014
VENTOS DA BAHIA - FASE 1 MULUNGU DO MORRO / BA PRE-DESIGN ACCIONA 2014
PONTAL 2A E 3B VIAMÃO / RS DETAILED DESIGN ALSTOM 2015
BONS VENTOS DA SERRA I SERRA DE IBIAPABA / CE e PI EXPERTISE WEG 2015
VENTOS DA BAHIA BONITO E MULUNGU DO MORRO / BA DETAILED DESIGN ACCIONA 2016
VENTOS DO PIAUÍ CURRAL NOVO DO PIAUÍ / PI PRE-DESIGN GAMESA 2016
VENTOS DA BAHIA - FASE 2 MULUNGU DO MORRO / BA EXPERTISE VESTAS 2017
BABILÔNIA MORRO DO CHAPÉU - VÁRZEA NOVA / BA DETAILED DESIGN GAMESA 2017
VENTOS DO ARARIPE SIMEÕES / PI - ARARIPINA / PE EXPERTISE GE-ENERGY 2017
UMBURANAS UMBURANAS / BA EXPERTISE GE-ENERGY 2018

News

Recently, CTE WIND BRASIL performed the design review of the foundations of Brazil's largest wind farm, the Complexo Eólico Ventos do Araripe III, with an installed capacity of 360MW. The project is located in the Chapada do Araripe, states of Pernambuco and Piauí. The verification included 156 wind turbine foundations, transmission towers foundations and substation foundations elements.

  • Araripe3_vue
  • Araripe3_pylone
  • Araripe3_sous_station

Projects in Brazil

  • Pontal 2A & 2B Wind Farm: Design of 18 pile foundations. The turbines are ALSTOM ECO 122.
    • illus_pontal_1
    • illus_pontal_2
    • illus_pontal_5r
  • Cerro Chato Wind Farm II: Design of 23 shallow foundations. The installed turbines are GAMESA G97.
    • illus chato 04
    • illus_chato_01
    • illus_chato_03
  • Ventos da Bahia Wind Farm: 22 pile foundations project for ACCIONA AW 125/300 turbines using a concrete tower. Civil engineering works are scheduled for July 2016.
    • illus vdb 1
    • illus vdb 2
    • illus vdb 3